funny-picture-winter-favorite-thing-seasonMost people who really know me, know that I’m not a fan of winter. And, this winter . . . yeah, I’m ready for warmer weather. But, looking at one positive, when the temperature is below freezing, the ground is solid and we don’t have to worry about all the mud that is everywhere around the construction site and the mud that finds its way into the house, on our clothes, on our shoes, and then tracked into our car and truck.

Sorry for the delay in writing a blog post. What with the holidays, snow, Arctic cold temperatures, flu, and winter blues, I just didn’t have the energy or excitement I usually do to write the last several weeks. But, I’ve been getting phone calls, texts, Facebook messages, and emails from family and friends asking what was going on with us and the house. Okay – I’ll try and get out of my winter funk and get you caught up.

Remember that mold problem in the crawl space? Well, Todd got most of the sealing done the week before Christmas. We have not seen or heard from him since then! Bye bye, Todd. Will we ever see you again? ๐Ÿ˜• Since the manual application of spraying Borax and scrubbing it over the mold was taking so long and Todd was gone, Bill did some research and decided to rent this from Home Depot the weekend after Christmas.

Mold Fogger

Mold Fogger

It took several hours to fog four gallons of the Mold Control liquid under the house. By fogging the liquid, it reaches all the nooks and crannies, sticks and when it dries, it is supposed to destroy the mold and prevent it from coming back. I hope so.

December 30, we received a big delivery of drywall.

Drywall delivery!

Drywall delivery!

Crane picking up the drywall

Crane picking up the drywall

New Year’s Eve day, we had three different crews working on the house: drywall hanging crew, stone crew, and insulation crew.

The insulation guys sprayed foam around the seal plate in the crawl space. I didn’t get a picture of the insulation crew but they looked like this after crawling out.

Insulation guy

Insulation guy

The stone guys started on our chimney first. They used scaffolding and worked as a good team. They actually worked New Year’s Day, too, because snow and cold temps were predicted for the rest of the week.

This slideshow requires JavaScript.

The stone crew is one of our favorite bunch of guys. They are friendly, love to show you their work, very appreciative when I tell them what a great job they are doing and how well I like it, and fun to be around. I think they like us, too. They always wave when I drive out of Jill and Jim’s driveway. But, they probably like us the most because we decided to add more stone to the house! ๐Ÿ˜€ More on that later.

Then, there was the drywall hanging crew. Definitely the hardest crew to get along with so far and the messiest. Granted the house was cold inside. We couldn’t do anything to heat it until they installed the sheets of drywall on the ceiling and then we could have the insulation crew come back and blow the insulation into the attic. If we turned on the portable electric furnace without the ceilings installed and insulation, the heat would have gone right up through the roof. So, the drywall crew complained and complained to Bill about lots of things. They only worked December 31st the first week.

Bill decided to put a pipe running diagonally above the fireplace mantel area if he ever wanted to run cables/wires up there. He needed to get it done before the drywallers got to that area. It was at that time that Bill noticed that we had a big dent in the pipe going up from our wood burning fireplace.

Big 'ol dent

Big ‘ol dent

Bill said the fireplace installers had to have done it. He sent pictures to the fireplace guy and to our HVAC guy to see how it could be fixed and if the dent would pose a leaking problem. Turned out Jason, the HVAC guy, provided Bill with some stainless steel and he clamped it over the pipe. And, the fireplace people gave us a $50 credit. All done before the drywallers hung the sheets around the fireplace surround.

The fixed pipe

The fixed pipe

The next week the drywallers worked on Monday (Jan. 7) and finished hanging the drywall in the house and the garage on Tuesday (Jan. 8). It was a big ‘ol mess in the house.

Big mess in the house after drywall hangers left

Big mess in the house after drywall hangers left. That’s Bill picking up some scraps.

However, we had asked that the drywall company clean up all the scraps and remove from the house. And, we agreed to a price. Best $200 we could have spent. The owner of the company ended up doing the clean-up on Wednesday, Jan. 9. He even recycled all the drywall scraps and took them away in his truck. That was a good thing. Otherwise, I think our dumpster would have had to be emptied after that! The way it is, we still have not had to pay to empty it yet.

It was exciting to see the rooms with walls up.

This slideshow requires JavaScript.

The stone guys have worked as many days as they could, weather permitting. It was interesting to see how they tented the area in the winter and used a bullet heater inside of it to set up the mortar.

Mudding the front of the house

Mudding the front of the house

Mud

Mud

The tented stone area

The tented stone area

It was so warm in the make-shift tent that they didn’t wear coats – and it was really cold outside!

Mud applied and installing the stone

Mud applied and installing the stone

Bill said it was really interesting to watch how they applied the mortar. They used bags with tips – much like ones you would use to decorate a cake!

Front section of the garage done. The ledge cap wasn't installed yet

Front section of the garage done. The ledge cap wasn’t installed yet

Front of the house with the tents

Front of the house with the tents

Friday, January 10, Bill scheduled the insulation guys to come back and blow the insulation into the attic. After that, he hooked up the portable furnace and turned it on.

Portable furnace

Portable furnace

What with those horrible Arctic temps that came through it was still hard to keep the house totally warm because we still didn’t have our garage doors! Bill had large pieces of plastic and foam insulation blocking the garage door areas. He even made a make-shift door on one side to try to keep as much heat in as possible. That Bill, he’s always trying to make things work. Wished I had a picture of that door – it was pretty ingenious! Unfortunately, that was when I was sick and I didn’t get out of the house for about 10 days except to drive down the driveway and pick up the kids from the bus stop.

Now the reason we didn’t have garage doors was because we decided to upgrade. Yep, we did! And, they had to be special ordered. Bill and I were going to keep it a secret from our builder (Jim) and Jill until they were installed. However, Jim, being the ever diligent builder – called our exterior materials rep and asked why we didn’t have doors yet. ๐Ÿ˜ณ There went that surprise! Well, I think it was still a surprise, just not the one we wanted! ๐Ÿ™‚

Tuesday, January 14, the garage doors were installed. I was holding my breath that what we picked out would match with the stone and compliment the mahogany front door. Well, they did not disappoint! We love them. We went with steel insulated fiberglass mahogany stained carriage doors with windows that mimic the grids in our front windows.

Garage doors

Garage doors

close-up of garage door

close-up of garage door

So, when the garage doors were being installed Bill and I talked that it would look strange not having the stone go all the way along the garage door side of the house. It was going to be where everyone pulled up and would see. So, we asked Rick to give us a price of what it would cost to stone the garage side. Gulp! Another upgrade. Rick said they had an extra pallet of stone so we should have enough to do it. So, we said yes!

Then . . . driving up Jill and Jim’s driveway after picking the kids up from the bus, I’m looking at the west side of the house thinking – well, this side is going to look strange not having stone on it. Who puts stone on one side of their house and not the other? Bill said he would! I said I didn’t want to. Now, don’t you think it would look better to having matching sides? Doesn’t the west side look like it needs stone?

West side of house needs stone!

West side of house needs stone!

So, Bill called Rick that evening and said verbatim, “My wife wants stone installed on the west side of the house!” ๐Ÿ˜€ So, Rick had to order more stone! We are waiting for the stone to come in to finish the exterior. But, here is what it looks like so far.

This slideshow requires JavaScript.

We had a different crew who did the taping and mudding of the drywall. Turns out they were as grumpy as the first crew! They would work one day or two a week and then not come back until the following week. They said they had to leave the mud dry so they could sand it off.

The tub in the hall bathroom has mud all over it. Yuck!

The tub in the hall bathroom has mud all over it. Yuck!

Master shower

Master shower

Family room taped and mudded

Family room taped and mudded

Kitchen

Kitchen – not sure why our well tank is inside

Dining area

Dining area

Laundry Room

Laundry Room

Since our siding guys were backed up for about a month, we didn’t get started on the siding until mid January. The siding was delivered into our garage on Thursday, January 16. This has posed a big problem for the drywallers! And, when I went down to see the siding and trim, I noticed that the shakes that we ordered for our gables were wrong.

Hardie Cement Board and trim in the garage

Hardie Cement Board and trim in the garage

Wrong shakes

Wrong shakes

The shakes we got were single 7 inch rough split with a straight edge. What we wanted are double 9 inch rough split with staggered edge. They reordered the shakes the following week. Not sure how long those will take to get in.

So, the siding guys started on Friday, January 17. They started by installing the fascia and soffits.

Soffits and Fascia

Soffits and Fascia

Since the siding guys were also going to build our columns for the front porch, Bill and I had to decide the size and where we wanted them installed on the porch. We originally had purchased stone caps for the columns the same size as Jill and Jim’s. Turns out that was way too big for our porch.

Jill and Jim's columns

Jill and Jim’s columns

So, over the weekend, Bill measured Jim and Joan’s columns on their house and we decided we needed something smaller than both of theirs! Bill got out two of our moving boxes and we placed them on the porch to get a size perspective. Turns out I didn’t want the stone to go up as far on our columns as Jill and Jim’s.

Using moving boxes to size our columns

Using moving boxes to size our columns

This is the size we decided on - 20 inch width and 18 inch depth.

This is the size we decided on – 20 inch width and 18 inch depth.

The top of the stone on the column will be the same height as the stone on the house. I wanted to make sure the columns did not block our exterior lights which will be mounted on each side of the sidelites of the door. Oh, and by the way, even though you cannot see in this picture, the color I picked for the concrete on the front porch matches the stone wonderfully! I was so happy!

Monday, January 20, we went over with the crew leader what all our exterior trim was supposed to look like before the guys started installing it that day. That evening Bill asked Jim about the flashing that was supposed to be installed behind the trim. Apparently, the guys didn’t install it. Yikes! Jim contacted the material sales guy and he contacted the siding crew. Unfortunately, Tuesday, Jan. 21, they had to rip off all the trim they had installed the day before and install the flashing.

The drywallers only worked one day last week. Bill called the owner and he said they were trying to stall their work until they could get into the garage. He said there was no way they could work around all that siding since the guys preferred to wear stilts instead of using scaffolding. And, there was no way we could manually move 7000 lbs of siding! We are anxious for the drywallers to get done as our trim and interior door package is already a week delayed in delivery. All of that needs to be stored in our house. And, I got an email that our bathroom vanities, storage cabinet and window seats are ready. At least they said they could hold them for us. What a mess working around everyone’s schedules.

So, the siding guys worked this weekend – mainly because they couldn’t work several days last week because of the weather and because we have really COLD temps coming tomorrow through Wednesday. They have gotten a lot done in those two days. I hope enough of the siding is out of the garage that the drywallers can finish this week. Here are some pictures of the siding. Now, keep in mind that the color of the lap siding is a primed colored siding. We are going to have our painter paint the siding and trim. I’ve told everyone that the siding color now reminds me of baby poop! ๐Ÿ˜ฏ And, I just know that when anyone rides down the road and looks at it, they will say, “What were those people thinking!” ๐Ÿ˜ฆ

Trim around the windows

Trim around the windows

Trim around the garage doors

Trim around the garage doors

Siding on the back

Siding on the back

Back siding

Back siding

Garage side siding finished

Garage side siding finished

View of the back and garage side with siding

View of the back and garage side with siding

Starting on the front of the house with siding

Starting on the front of the house with siding

Front siding going up fast

Front siding going up fast

See, I just know you guys are saying, “What were they thinking!” as you drive past. Oh well, sometime this spring the house will be the colors I want it to be – the siding I want the same color as the fascia and soffit. And, the trim will be bronze – close to the bronze window color as possible.

Poor Bill continues to work on the cabinets when he can. He made a trip back to Indy two weeks ago and bought more mahogany plywood and got the rest of the hinges for all the cabinet doors. We are finding we lack a lot of material resources down here that Indy has. Oh well, it gave Bill a chance to go out to lunch with some of his work buddies and shop at some of the stores there. And, he got home before one of their big snows!

Bill putting together one of the upper wall cabinet doors.

Bill putting together one of the upper wall cabinet doors.

First time he ever made one with glass inserts. He's really talented.

First time he ever made one with glass inserts. He’s really talented.

And, in-between all of what has gone on in the last month, Bill and I went furniture shopping! Several times. As soon as the drywallers are done, the painter will start. And, I had not picked out any colors for the interior of the house. None! And, didn’t know where to start. I don’t think I’m going to reveal the furniture we bought until the house is done. But, I will say, Jennifer at Dean Bosler’s Furniture is the best sales woman and interior designer we could have worked with. The woman read my mind and a ton more that wasn’t in my mind. We ended up buying new furniture for the family room, a chest for the entry way, and a mattress and box spring for our “new to us” king bed. And, she picked out a paint color for the family room. Funny thing, it is the same strip that I picked out at the Benjamin Moore paint store as one of my favorites over a month before we went furniture shopping. How spooky is that?

Our painter wants to use Behr paint at Home Depot. I found out they can match any paint colors for me. So, the last several days, I’ve been creating digital mood boards using Keynote software. I place our furniture on a blank slide and color the background with paint colors. I think I’ve come up with a plan for the house. I’ve made a mood board for every room in the house. Here’s what our hall bath mood board looks like. The vanity color is showing up in the mood board with an orange tone – which it is not. It’s really called a Brandywine stain with black dye toner.

Hall Bath Mood Board

Hall Bath Mood Board

That’s about everything that’s gone on the last month.

Today is Bill’s birthday. What does Bill do on his birthday? He works on cabinets in the pole barn! Bill did tell me this morning that he cannot wait until this house is built. He isn’t enjoying all the PITA jobs that goes along with this custom build. He said it was even worse than working! I feel bad for him. He seems to make at least 5-6 trips to Menards or Lowes every week. One day he made 3 trips to Menards. We don’t live close to Menards. He said maybe it wouldn’t be so bad if he weren’t trying to build the cabinets at the same time. Every time he gets started on the cabinets, one of the contractors needs something and then that usually involves phone calls or trips to the big box store or somewhere else. We are all hoping that once the drywallers, siding guys, and stone guys get done, Bill will get a break. God bless him!

Until we meet again! Stay warm and safe. Think SPRING!

2 thoughts on “Building During Winter Months . . . Brrrrr!

  1. And you continue to astonish me with talent and detail in the HOW to do it how-to! Love and warm thoughts to Bill, Jill and Jim…oxoxoxs, your inside sister #4, Paula

    • Haha! Paula, we are on the Internet researching or looking on houzz.com for inspiration. We rely on Jim and his Dad, too, for answers. It takes a village to build this thing! ๐Ÿ™‚

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s