Troubles Turned to Blessings in Disguise!

Our real blessings often appear to us in the shape of pains, losses and disappointments; but let us have patience and we soon shall see them in their proper figures. ~Joseph Addison

I’ll apologize right off the bat for waiting a whole month between blog posts. But, to be honest with you, there wasn’t a lot to blog about until recently. Now things are moving again in the right direction.

When I last posted we were waiting for the painter to get done with the interior painting and staining and cabinets. Well, we continued to wait. The painter is cheap and good at what he does, but he sure tries our patience as far as showing up for work.

Early Monday, April 7, we received delivery of the cabinetry that we ordered for our bathrooms and window seats for the family room. We peaked inside to see what the colors looked like; however, we left the cabinets in their wrapping for three weeks until the trim carpenters opened them up.

The painters showed up Monday and Tuesday that week for a couple of hours each day. Then, they came Wednesday and Thursday early in the morning to spray the laundry cabinet doors and drawer fronts. They were gone those two mornings before we got down there. Shayna worked Monday and Tuesday, April 14-15, applying poly on kitchen cabinets and painted one coat of paint on the laundry cabinets.

This slideshow requires JavaScript.

Sometime during the April 12-13 weekend, we discovered that our pretty mahogany-stained garage doors weren’t as pretty as they were before. Looking really close, it looked like paint over-spray all over them! Nooooooo!

This is how they looked when they installed them.

close-up of garage door

close-up of garage door

This is how they looked a couple of weeks ago:

This slideshow requires JavaScript.

Two possible suspects for over-spray: subs who installed the Hardie Board (they sprayed primer paint on the ends of each cut); or our painter who sprayed our laundry cabinets outdoors. Either way, we weren’t happy about what they looked like. Those doors were an expensive upgrade. Bill wanted to see if he could get the paint off of them. More on that later.

We were really anxious to get done with the interior of the house so we could bring in the trim carpenter. We were being held up on the interior waiting for the painter to finish and were being held up on the exterior work because of weather. The painters did not show up the rest of the week or the next week! Promises were made by the painter over and over again, but they would always be a no-show.

Jim called our trim carpenter on Saturday, April 19, to see if he was going to be able to fit us in his schedule. He made an appointment to meet with Bill and me on Monday, April 21, to do a walk-thru. I printed out all the pictures of how we wanted our trim to look with examples of beams, mantel, headband, etc., in addition to a list of all the wood materials (and doors) we had received from Fehrenbacher Wood Specialities.  I also had printed all the cabinet layouts. During the meeting Mr. Carpenter kept shaking his head and saying, “I’m not sure if I can fit you in or not. The timing is really bad for me right now.” He even said maybe he could get a crew in and bang out all the trim and then come back later (a long time later) to install the cabinets. The months June and July were mentioned!!!! Are you kidding me?  He said he’d go back home and look at his schedule and see if he could squeeze us in. Early the next morning, he called me and said he was so sorry but he knew we were in a hurry to get the carpentry work done now and there was no way he could take on the job.

There was no time to mope around so Bill, Jim and I moved on getting another trim carpenter right away. I went through our bid construction binder and found we had only received one estimate (Mr. Carpenter) when we sent the bids out in the fall. Bill looked through our spreadsheet of contacts who we sent bids to in the fall and came up with two names. Neither one had sent in estimates then. He text Jim and he immediately set up appointments with both of them to come out and do walk-thrus: Mr. Carpenter #2 was scheduled for the next day (April 23) and Mr. Carpenter #3 was scheduled for that Friday (April 25).

Bill and I really liked Carpenter #2 and his son who came with him. They were not intimidated by our stained trim package. Not many people are using stained trim or doors these days. Everyone is going painted white. He said he could help us design and build our closet systems, too. He and Bill talked about mitering the baseboards for all the corners and he said it was no problem. Carpenter #2 said he would send us an estimate and schedule in a couple of days. In the meantime I found Carpenter #2 had a Facebook page for his business and I was impressed by what I saw.

Carpenter #3 came after he got off work Friday evening. He works full-time for a construction company (mainly commercial work) but does carpentry work on the side. In fact, Jim said he was the handyman in their old neighborhood and everyone loved him. Jim had never met him. As soon as he arrived, he got out of his truck, introduced himself, and immediately asked how we liked our garage doors. I said that we loved them until we got the paint over-spray. He went up to the doors and looked around. He told us that he had five of the same doors on his new house he just got done building up the road from us and they had to all be replaced because the finish was cracking! He started pointing out that ours were cracking, too. Told you there was more to our garage door story. And, there is still more . . . Later. 🙂

Carpenter #3 was younger than #1 or #2 but was knowledgeable. He looked at our door frames and questioned why they were broken down (easier for painter to stain but more for carpenter to install) and had his own idea of installing baseboard corners. Bill told him they had to be mitered PERIOD. He said he would drop by our estimate over the weekend and give us his schedule of when they could do the job. Before leaving, Bill gave him a piece of our wood so he could practice cutting miters for the baseboard. You got to love Bill!

Bill and I decided if the price and schedule were right, we’d go with Carpenter #2. Famous last words! Sunday afternoon Jim got a call from Carpenter #3. His price was low. Two thousand lower than Carpenter #1’s initial estimate (which would have gone up a couple Ks after our walk-thru if he had taken the job). And, he and his brother and another guy could start working Wednesday afternoon after they got off work. He said they would work Wednesday-Friday evenings, all day Saturday and all day Sunday.

Bill called Carpenter #2 and asked if he had an estimate for us. He emailed me his detailed estimate later that afternoon. It was almost double the price of Carpenter #3 (and $3K more than #1’s initial bid) and he didn’t give us dates of when they could start.

After much consideration (and reassurance from Jim that all their old neighbors raved about his work) we decided to go with Carpenter #3. This is where Blessings in Disguise comes into play as you’ll see in the upcoming photos.

Now, all we had to do was get that painter back out to finish the inside BEFORE the trim carpenter came on Weds. We devised a punch list for Mark and gave him a deadline. One of the items was to repaint one of the upper walls in the family room which we thought was painted the wrong color. See what you think.

Same or Different?

Same or Different?

Mark worked Monday and Tuesday, April 28-29, long days. Turns out the walls above are painted the same color. He even applied paint to both of the walls again to show Bill. Apparently, the light causes an optical illusion. Bill said Mark even exceeded his expectations of getting interior stuff finished. He applied poly to the stained screen frames, he stained and applied poly to the rest of the windows and the sliding glass door. He painted the laundry cabinets and toe kicks which were missed the first go-around.

Laundry Cabinet Toe-kicks

Laundry Cabinet Toe-kicks

During the last couple weeks of April, Bill worked in his workshop re-arranging and organizing it in preparation for the electrician and plumber. We bought new storage cabinets.

New Workshop Storage Cabinets

New Workshop Storage Cabinets

Putting one of the big cabinets together.

Putting one of the big cabinets together.

Bill had bought several boxes of discontinued hardwood flooring at Lowe’s over a year ago for $5 a box. He finally put them to good use and installed new tops on some of his cabinets.

Updated cabinets with new tops

Updated cabinets with new tops

Big cabinet all ready filled up!

Big cabinet already filled up!

Bill decided to sand and poly his work bench, too! He built this years ago at our last house.

Cleaned up the work bench

Cleaned up the work bench

Vectren came out and installed our permanent electric mid April. We still have the temporary post, too, which the trim carpenter is using. After he’s done, that will be removed. They ran our electric and gas lines to the house, too.

Tearing up the road to bring gas across from the other side of the road

Tearing up the road to bring gas across from the other side of the road

There's the lines

There are the lines

They ran the lines up the yard to the left of the driveway and then under the driveway by the garage to final hookup to house.

They ran the lines up the yard to the left of the driveway and then under the driveway by the garage to final hookup to house.

Permanent electric installed

Permanent electric installed

We're all set

We’re all set

Wednesday, April 30, we had our HVAC installed. They said they’d be back to dig the geothermal when the ground wasn’t so wet and we had electric hooked up the our new HVAC unit.

HVAC installed

HVAC installation

And, the trim carpenters started that same day. Tim Baker is Mr. Carpenter #3. OMG! He is like an energizer bunny. Tim arrived around 1:30 that day and started working on baseboards. Guess what? He sure did a great job mitering those corners!

Mitered baseboard corners

Mitered baseboard corners

Linen closet baseboards

Linen closet baseboards

Soon Tim’s brother (Mike) arrived and Tim put him on installing the interior doors.

First door installed

First door installed

Then Neal arrived and Tim put him on installing cabinets.

Neal checking out the first cabinet - the upper corner cabinet

Neal checking out the first cabinet – the upper corner cabinet

Bill was there to help with the cabinets.

Bill helping Neal installed cabinets

Bill helping Neal install cabinets

Tim asked if I would come down to approve the window trim he did on the first window before he continued. I was ecstatic when I saw it! He said he figured I liked it by the look on my face.

Sample of window trim and sill

Sample of window trim and sill

The guys worked until about 8:00 pm that evening and returned the next day with a fourth guy. They took off Friday, worked all day Saturday and took off Sunday. They got a lot done, but still a lot more to do.

Three upper kitchen cabinets installed

Three upper kitchen cabinets installed

I’ll never be able to reach anything on those top upper cabinets. Jill took a picture of me reaching up, but the photo was blurred. I could only reach up to the bottom two levels of the corner cabinet. 🙂 To show you how tall these are, here is a picture of Bill reaching up. He can reach three levels!

Bill reaching up to wall cabinet.

Bill reaching up to wall cabinet.

 

Close-up of window sills

Close-up of window sills

Close-up of window top casing trim

Close-up of window top casing trim

Door trimed out with upper casings the same as the window trim and we have plinth blocks on the lower part of side casings

Door trimmed out with upper casings the same as the window trim and we have plinth blocks on the lower part of side casings

Headband installed in most of the areas

Headband installed in most of the areas

Double closet doors in one of the bedrooms (garage entry door still to be installed)

Double closet doors in one of the bedrooms (garage entry door still to be installed)

Sample of window, door and headband

Sample of window, closet door and headband

Front door trimmed out

Front door trimmed out

Drop down beam in master bedroom hallway

Drop down beam in master bedroom hallway

Laundry cabinets being installed

Laundry cabinets being installed

Laundry cabinets ready for doors

Laundry cabinets ready for doors

Master bathroom vanities going in

Master bathroom vanities going in

Master bathroom with desk area in-between vanities

Master bathroom with desk area in-between vanities

These vanities were such a tight fit and our 5″ baseboards wouldn’t fit under the toe-kick. So, Tim “ripped” the bottom part off the baseboard in the whole bathroom to match all around. I’m not sure if you can see or not, but we also had electric run so I could have a plug on the side of the right vanity. The electric was in the wrong place, but Tim cut the drywall and moved it over. That part will be covered up with granite backsplash. These guys were great at coming up with solutions that worked and still looked good.

The hall bath was a bear to install, too! They really didn’t allow any give or take on these cabinets. Tim and Bill decided to use a piece of our trim to use as a spacer to bring the cabinets out a little from the door. Looks fine and worked. Bill said Neal is a perfectionist. I’m glad!

Hall bath cabinets going in

Hall bath cabinets going in

Hall cabinets installed

Hall cabinets installed

I didn’t think this huge master bath storage cabinet with seat was going to fit. But, Neal made it work!

Master bath storage cabinet

Master bath storage cabinet

A couple of things happened which we had to remedy.

Here was an oops I discovered where two doors met.

What's going on here?

What’s going on here?

But was quickly fixed. Tim laughed when I took the picture below and said while winking, “That’s always been like that!” I laughed and said, “Sorry – I have a picture to show otherwise! But, I love that you fixed it!”

Fixed casing

Fixed casing

Bill left Neal for less than 5 minutes. When he returned he saw Neal drilling some holes in an area where we have water lines! We had a picture for the carpenters of the kitchen wall before drywall to show them where we had blocking and water lines. Bill had to open the drywall up a little to see if there was damage. Neal had nicked the pex tubing.

Water line knicked

Drywall cut out to assess water line nicked

Bill called the plumber that evening and asked if he could come out the next day. Bill ended up texting him a close-up photo of the tube and the plumber said it was fine because the tubing is so thick and it was only nicked. I hope that is true when we turn on water!

See the cabinet to the left of the large pantry cabinet below? Looks like that is going to be moved to the garage bump-out area. When our electricians came to installed the electric to the new HVAC system and our well pump they said we couldn’t install anything permanent in front of the electrical panels.

Pantry cabinet installed

Pantry cabinet installed

We talked about installing the cabinet after all the inspections and we moved in, but . . . I decided this weekend that I still didn’t have a place for my mops and vacuum cleaner. So, those are going to be stored to the left of the pantry cabinet and we’ll also have room for this piece which I decided not to use in the entry cause it just didn’t go with everything else in the family room.

Antique desk

Antique desk

We are going to have the painter paint it the same colors as our laundry cabinets. This will sit opposite where my computer area will be in the laundry room so, I’ll use it as my mail/bill desk.

Thursday, May 1, I called David Ferrero to see if he could measure and install our glass shower door which we would order from Ferguson’s. David came out Friday morning, May 2. Lindsey at Ferguson’s called me Monday, the 5th, with price and we placed our order for the door and shower grab bar. Should be delivered in about 2 weeks.

Electricians hooked electric to the new HVAC system and well pump (the blue tank) on Friday, too.

Electric hooked up to HVAC and Well Pump

Electric hooked up to HVAC and Well Pump

One of the biggie problems over the weekend was that our window seats didn’t fit on either side of our fireplace. All of the engineers in the family gathered down at the house to see if there was any way to remedy the situation. Bill and Tim talked about cutting the stone down on the lower side where the seat would go. But, if they did that and got the seat in, we wouldn’t be able to open the drawers. We finally came to the conclusion that the initial measurements by our cabinet sales guy were off. I was given the privilege of delivering the bad news to our cabinet sales guy. Gulp!

Rick came out Monday, May 5, and measured over and over. He said sometimes these things happen. He said they’d make it right and he’d put a rush on getting new ones made. Bill helped Rick take the window seats away.

IMG_4363

IMG_4364

Things could have been a lot worse. We can move in without window seats. If this had been the case of bathroom vanities, we would have had a major setback. Not worth getting upset about it.

Remember the garage door saga? Bill spent many hours Sunday, May 4, trying to clean off the paint on the garage doors. He was able to get a lot of it off but he discovered even more cracking of the finish. Monday, he called the company where we ordered the garage doors. We discovered they have a life-time warranty against cracking as long as you are the original purchaser. But, gosh, should these be cracking so quickly? These weren’t cheap doors! Anyway, they are going to be sending the Chi door representative out to look at the doors. What a pain!

Since we had a warm sunny forecast for this week with no rain Monday-Thursday, we asked Jim to text Mark the painter and asked that he start painting the exterior of the house. He said he’d pick up the paint in the morning and be out. He didn’t get here until 3:00 pm, but he came and painted several hours. Finally going to get rid of that “baby poop” greenish primed color. We think the color is going to blend in well. It will be a little darker once the second coat goes on.

First coat of paint (bottom section)

First coat of paint (bottom section)

Close-up of paint (on right side). Looks like he missed a couple spots.

Close-up of paint (on right side). Looks like he missed a couple of spots.

Front section painted one coat

Front section painted one coat

Looking better

Looking better

And, our excavator septic installer showed up Monday and Tuesday to install the septic! Yay! Bill said they have to wait until the city says they can dig the lateral lines. Something about it still being too wet and waiting until results from more soil testing samples come back.

Digging

Digging

Septic Tank

Septic Tank

This view shows location in front of house

This view shows location in front of house

There is some deep digging going on

There is some deep digging going on

Piping

Piping

Dig dig dig

Dig dig dig

Built the back pad up for our back patio

Built the pad for our back patio

We have two painters today, so they should be able to get a lot more done. And, the trim carpenters plan to work this afternoon/evening today and tomorrow installing our kitchen and island cabinets. We have the granite people coming on Monday, May 12, to template counter-tops and bathroom vanities. They told me that it will be another 2-3 weeks after that when they come back down and install. They are coming from Indy. That will push completion date out further because we can’t have plumber install all his stuff until the sinks are installed (we are getting our sinks from the granite company).

Bill lined up the cabinets and the island parts so everything will be ready for the carpenters.

Kitchen/island cabinets lined up ready for install

Kitchen/island cabinets lined up ready for install

Closer view of island parts

Closer view of island parts

I cannot wait until these are installed and we can see what they will look like. Bill has to get the glass for the small upper cabinets and install it into the doors before installing cabinet doors. He can start installing doors and slides after cabinets are installed.

The carpenters plan to work all day Saturday doing our beams and mantel in the family room and installing the tongue-and-groove porch ceiling. They still have the garage entry door to install along with more trim and headband in the kitchen after cabinets go in.

Tim also said he could build our closet systems. He and his wife invited Bill and me to their new home last weekend to see his trim work in their home. Gorgeous! I told him he was our blessing in disguise! I’ve looked at houzz.com for closet ideas and printing out photos to show Tim. I’ve sketched out the closet plans on graph paper and will show Tim today what I’ve come up with so far and see what he will charge us. We will buy the materials and Bill will stain and poly the wood to match the rest of our house.

Master Walk-in Closet

Master Walk-in Closet ideas

All the other closets

All the other closets

The last item in this post is about our well. The well guys came out yesterday, May 6, and hooked our well to the pump. They had Bill running it for 15 minute intervals to get some of the gunk out that might have settled. But, we have water!!!!!

We hope we will be in our final push soon. We sure cannot wait to move into this new home!

 

 

 

 

 

Building During Winter Months . . . Brrrrr!

funny-picture-winter-favorite-thing-seasonMost people who really know me, know that I’m not a fan of winter. And, this winter . . . yeah, I’m ready for warmer weather. But, looking at one positive, when the temperature is below freezing, the ground is solid and we don’t have to worry about all the mud that is everywhere around the construction site and the mud that finds its way into the house, on our clothes, on our shoes, and then tracked into our car and truck.

Sorry for the delay in writing a blog post. What with the holidays, snow, Arctic cold temperatures, flu, and winter blues, I just didn’t have the energy or excitement I usually do to write the last several weeks. But, I’ve been getting phone calls, texts, Facebook messages, and emails from family and friends asking what was going on with us and the house. Okay – I’ll try and get out of my winter funk and get you caught up.

Remember that mold problem in the crawl space? Well, Todd got most of the sealing done the week before Christmas. We have not seen or heard from him since then! Bye bye, Todd. Will we ever see you again? 😕 Since the manual application of spraying Borax and scrubbing it over the mold was taking so long and Todd was gone, Bill did some research and decided to rent this from Home Depot the weekend after Christmas.

Mold Fogger

Mold Fogger

It took several hours to fog four gallons of the Mold Control liquid under the house. By fogging the liquid, it reaches all the nooks and crannies, sticks and when it dries, it is supposed to destroy the mold and prevent it from coming back. I hope so.

December 30, we received a big delivery of drywall.

Drywall delivery!

Drywall delivery!

Crane picking up the drywall

Crane picking up the drywall

New Year’s Eve day, we had three different crews working on the house: drywall hanging crew, stone crew, and insulation crew.

The insulation guys sprayed foam around the seal plate in the crawl space. I didn’t get a picture of the insulation crew but they looked like this after crawling out.

Insulation guy

Insulation guy

The stone guys started on our chimney first. They used scaffolding and worked as a good team. They actually worked New Year’s Day, too, because snow and cold temps were predicted for the rest of the week.

This slideshow requires JavaScript.

The stone crew is one of our favorite bunch of guys. They are friendly, love to show you their work, very appreciative when I tell them what a great job they are doing and how well I like it, and fun to be around. I think they like us, too. They always wave when I drive out of Jill and Jim’s driveway. But, they probably like us the most because we decided to add more stone to the house! 😀 More on that later.

Then, there was the drywall hanging crew. Definitely the hardest crew to get along with so far and the messiest. Granted the house was cold inside. We couldn’t do anything to heat it until they installed the sheets of drywall on the ceiling and then we could have the insulation crew come back and blow the insulation into the attic. If we turned on the portable electric furnace without the ceilings installed and insulation, the heat would have gone right up through the roof. So, the drywall crew complained and complained to Bill about lots of things. They only worked December 31st the first week.

Bill decided to put a pipe running diagonally above the fireplace mantel area if he ever wanted to run cables/wires up there. He needed to get it done before the drywallers got to that area. It was at that time that Bill noticed that we had a big dent in the pipe going up from our wood burning fireplace.

Big 'ol dent

Big ‘ol dent

Bill said the fireplace installers had to have done it. He sent pictures to the fireplace guy and to our HVAC guy to see how it could be fixed and if the dent would pose a leaking problem. Turned out Jason, the HVAC guy, provided Bill with some stainless steel and he clamped it over the pipe. And, the fireplace people gave us a $50 credit. All done before the drywallers hung the sheets around the fireplace surround.

The fixed pipe

The fixed pipe

The next week the drywallers worked on Monday (Jan. 7) and finished hanging the drywall in the house and the garage on Tuesday (Jan. 8). It was a big ‘ol mess in the house.

Big mess in the house after drywall hangers left

Big mess in the house after drywall hangers left. That’s Bill picking up some scraps.

However, we had asked that the drywall company clean up all the scraps and remove from the house. And, we agreed to a price. Best $200 we could have spent. The owner of the company ended up doing the clean-up on Wednesday, Jan. 9. He even recycled all the drywall scraps and took them away in his truck. That was a good thing. Otherwise, I think our dumpster would have had to be emptied after that! The way it is, we still have not had to pay to empty it yet.

It was exciting to see the rooms with walls up.

This slideshow requires JavaScript.

The stone guys have worked as many days as they could, weather permitting. It was interesting to see how they tented the area in the winter and used a bullet heater inside of it to set up the mortar.

Mudding the front of the house

Mudding the front of the house

Mud

Mud

The tented stone area

The tented stone area

It was so warm in the make-shift tent that they didn’t wear coats – and it was really cold outside!

Mud applied and installing the stone

Mud applied and installing the stone

Bill said it was really interesting to watch how they applied the mortar. They used bags with tips – much like ones you would use to decorate a cake!

Front section of the garage done. The ledge cap wasn't installed yet

Front section of the garage done. The ledge cap wasn’t installed yet

Front of the house with the tents

Front of the house with the tents

Friday, January 10, Bill scheduled the insulation guys to come back and blow the insulation into the attic. After that, he hooked up the portable furnace and turned it on.

Portable furnace

Portable furnace

What with those horrible Arctic temps that came through it was still hard to keep the house totally warm because we still didn’t have our garage doors! Bill had large pieces of plastic and foam insulation blocking the garage door areas. He even made a make-shift door on one side to try to keep as much heat in as possible. That Bill, he’s always trying to make things work. Wished I had a picture of that door – it was pretty ingenious! Unfortunately, that was when I was sick and I didn’t get out of the house for about 10 days except to drive down the driveway and pick up the kids from the bus stop.

Now the reason we didn’t have garage doors was because we decided to upgrade. Yep, we did! And, they had to be special ordered. Bill and I were going to keep it a secret from our builder (Jim) and Jill until they were installed. However, Jim, being the ever diligent builder – called our exterior materials rep and asked why we didn’t have doors yet. 😳 There went that surprise! Well, I think it was still a surprise, just not the one we wanted! 🙂

Tuesday, January 14, the garage doors were installed. I was holding my breath that what we picked out would match with the stone and compliment the mahogany front door. Well, they did not disappoint! We love them. We went with steel insulated fiberglass mahogany stained carriage doors with windows that mimic the grids in our front windows.

Garage doors

Garage doors

close-up of garage door

close-up of garage door

So, when the garage doors were being installed Bill and I talked that it would look strange not having the stone go all the way along the garage door side of the house. It was going to be where everyone pulled up and would see. So, we asked Rick to give us a price of what it would cost to stone the garage side. Gulp! Another upgrade. Rick said they had an extra pallet of stone so we should have enough to do it. So, we said yes!

Then . . . driving up Jill and Jim’s driveway after picking the kids up from the bus, I’m looking at the west side of the house thinking – well, this side is going to look strange not having stone on it. Who puts stone on one side of their house and not the other? Bill said he would! I said I didn’t want to. Now, don’t you think it would look better to having matching sides? Doesn’t the west side look like it needs stone?

West side of house needs stone!

West side of house needs stone!

So, Bill called Rick that evening and said verbatim, “My wife wants stone installed on the west side of the house!” 😀 So, Rick had to order more stone! We are waiting for the stone to come in to finish the exterior. But, here is what it looks like so far.

This slideshow requires JavaScript.

We had a different crew who did the taping and mudding of the drywall. Turns out they were as grumpy as the first crew! They would work one day or two a week and then not come back until the following week. They said they had to leave the mud dry so they could sand it off.

The tub in the hall bathroom has mud all over it. Yuck!

The tub in the hall bathroom has mud all over it. Yuck!

Master shower

Master shower

Family room taped and mudded

Family room taped and mudded

Kitchen

Kitchen – not sure why our well tank is inside

Dining area

Dining area

Laundry Room

Laundry Room

Since our siding guys were backed up for about a month, we didn’t get started on the siding until mid January. The siding was delivered into our garage on Thursday, January 16. This has posed a big problem for the drywallers! And, when I went down to see the siding and trim, I noticed that the shakes that we ordered for our gables were wrong.

Hardie Cement Board and trim in the garage

Hardie Cement Board and trim in the garage

Wrong shakes

Wrong shakes

The shakes we got were single 7 inch rough split with a straight edge. What we wanted are double 9 inch rough split with staggered edge. They reordered the shakes the following week. Not sure how long those will take to get in.

So, the siding guys started on Friday, January 17. They started by installing the fascia and soffits.

Soffits and Fascia

Soffits and Fascia

Since the siding guys were also going to build our columns for the front porch, Bill and I had to decide the size and where we wanted them installed on the porch. We originally had purchased stone caps for the columns the same size as Jill and Jim’s. Turns out that was way too big for our porch.

Jill and Jim's columns

Jill and Jim’s columns

So, over the weekend, Bill measured Jim and Joan’s columns on their house and we decided we needed something smaller than both of theirs! Bill got out two of our moving boxes and we placed them on the porch to get a size perspective. Turns out I didn’t want the stone to go up as far on our columns as Jill and Jim’s.

Using moving boxes to size our columns

Using moving boxes to size our columns

This is the size we decided on - 20 inch width and 18 inch depth.

This is the size we decided on – 20 inch width and 18 inch depth.

The top of the stone on the column will be the same height as the stone on the house. I wanted to make sure the columns did not block our exterior lights which will be mounted on each side of the sidelites of the door. Oh, and by the way, even though you cannot see in this picture, the color I picked for the concrete on the front porch matches the stone wonderfully! I was so happy!

Monday, January 20, we went over with the crew leader what all our exterior trim was supposed to look like before the guys started installing it that day. That evening Bill asked Jim about the flashing that was supposed to be installed behind the trim. Apparently, the guys didn’t install it. Yikes! Jim contacted the material sales guy and he contacted the siding crew. Unfortunately, Tuesday, Jan. 21, they had to rip off all the trim they had installed the day before and install the flashing.

The drywallers only worked one day last week. Bill called the owner and he said they were trying to stall their work until they could get into the garage. He said there was no way they could work around all that siding since the guys preferred to wear stilts instead of using scaffolding. And, there was no way we could manually move 7000 lbs of siding! We are anxious for the drywallers to get done as our trim and interior door package is already a week delayed in delivery. All of that needs to be stored in our house. And, I got an email that our bathroom vanities, storage cabinet and window seats are ready. At least they said they could hold them for us. What a mess working around everyone’s schedules.

So, the siding guys worked this weekend – mainly because they couldn’t work several days last week because of the weather and because we have really COLD temps coming tomorrow through Wednesday. They have gotten a lot done in those two days. I hope enough of the siding is out of the garage that the drywallers can finish this week. Here are some pictures of the siding. Now, keep in mind that the color of the lap siding is a primed colored siding. We are going to have our painter paint the siding and trim. I’ve told everyone that the siding color now reminds me of baby poop! 😯 And, I just know that when anyone rides down the road and looks at it, they will say, “What were those people thinking!” 😦

Trim around the windows

Trim around the windows

Trim around the garage doors

Trim around the garage doors

Siding on the back

Siding on the back

Back siding

Back siding

Garage side siding finished

Garage side siding finished

View of the back and garage side with siding

View of the back and garage side with siding

Starting on the front of the house with siding

Starting on the front of the house with siding

Front siding going up fast

Front siding going up fast

See, I just know you guys are saying, “What were they thinking!” as you drive past. Oh well, sometime this spring the house will be the colors I want it to be – the siding I want the same color as the fascia and soffit. And, the trim will be bronze – close to the bronze window color as possible.

Poor Bill continues to work on the cabinets when he can. He made a trip back to Indy two weeks ago and bought more mahogany plywood and got the rest of the hinges for all the cabinet doors. We are finding we lack a lot of material resources down here that Indy has. Oh well, it gave Bill a chance to go out to lunch with some of his work buddies and shop at some of the stores there. And, he got home before one of their big snows!

Bill putting together one of the upper wall cabinet doors.

Bill putting together one of the upper wall cabinet doors.

First time he ever made one with glass inserts. He's really talented.

First time he ever made one with glass inserts. He’s really talented.

And, in-between all of what has gone on in the last month, Bill and I went furniture shopping! Several times. As soon as the drywallers are done, the painter will start. And, I had not picked out any colors for the interior of the house. None! And, didn’t know where to start. I don’t think I’m going to reveal the furniture we bought until the house is done. But, I will say, Jennifer at Dean Bosler’s Furniture is the best sales woman and interior designer we could have worked with. The woman read my mind and a ton more that wasn’t in my mind. We ended up buying new furniture for the family room, a chest for the entry way, and a mattress and box spring for our “new to us” king bed. And, she picked out a paint color for the family room. Funny thing, it is the same strip that I picked out at the Benjamin Moore paint store as one of my favorites over a month before we went furniture shopping. How spooky is that?

Our painter wants to use Behr paint at Home Depot. I found out they can match any paint colors for me. So, the last several days, I’ve been creating digital mood boards using Keynote software. I place our furniture on a blank slide and color the background with paint colors. I think I’ve come up with a plan for the house. I’ve made a mood board for every room in the house. Here’s what our hall bath mood board looks like. The vanity color is showing up in the mood board with an orange tone – which it is not. It’s really called a Brandywine stain with black dye toner.

Hall Bath Mood Board

Hall Bath Mood Board

That’s about everything that’s gone on the last month.

Today is Bill’s birthday. What does Bill do on his birthday? He works on cabinets in the pole barn! Bill did tell me this morning that he cannot wait until this house is built. He isn’t enjoying all the PITA jobs that goes along with this custom build. He said it was even worse than working! I feel bad for him. He seems to make at least 5-6 trips to Menards or Lowes every week. One day he made 3 trips to Menards. We don’t live close to Menards. He said maybe it wouldn’t be so bad if he weren’t trying to build the cabinets at the same time. Every time he gets started on the cabinets, one of the contractors needs something and then that usually involves phone calls or trips to the big box store or somewhere else. We are all hoping that once the drywallers, siding guys, and stone guys get done, Bill will get a break. God bless him!

Until we meet again! Stay warm and safe. Think SPRING!