Building During Winter Months . . . Brrrrr!

funny-picture-winter-favorite-thing-seasonMost people who really know me, know that I’m not a fan of winter. And, this winter . . . yeah, I’m ready for warmer weather. But, looking at one positive, when the temperature is below freezing, the ground is solid and we don’t have to worry about all the mud that is everywhere around the construction site and the mud that finds its way into the house, on our clothes, on our shoes, and then tracked into our car and truck.

Sorry for the delay in writing a blog post. What with the holidays, snow, Arctic cold temperatures, flu, and winter blues, I just didn’t have the energy or excitement I usually do to write the last several weeks. But, I’ve been getting phone calls, texts, Facebook messages, and emails from family and friends asking what was going on with us and the house. Okay – I’ll try and get out of my winter funk and get you caught up.

Remember that mold problem in the crawl space? Well, Todd got most of the sealing done the week before Christmas. We have not seen or heard from him since then! Bye bye, Todd. Will we ever see you again? 😕 Since the manual application of spraying Borax and scrubbing it over the mold was taking so long and Todd was gone, Bill did some research and decided to rent this from Home Depot the weekend after Christmas.

Mold Fogger

Mold Fogger

It took several hours to fog four gallons of the Mold Control liquid under the house. By fogging the liquid, it reaches all the nooks and crannies, sticks and when it dries, it is supposed to destroy the mold and prevent it from coming back. I hope so.

December 30, we received a big delivery of drywall.

Drywall delivery!

Drywall delivery!

Crane picking up the drywall

Crane picking up the drywall

New Year’s Eve day, we had three different crews working on the house: drywall hanging crew, stone crew, and insulation crew.

The insulation guys sprayed foam around the seal plate in the crawl space. I didn’t get a picture of the insulation crew but they looked like this after crawling out.

Insulation guy

Insulation guy

The stone guys started on our chimney first. They used scaffolding and worked as a good team. They actually worked New Year’s Day, too, because snow and cold temps were predicted for the rest of the week.

This slideshow requires JavaScript.

The stone crew is one of our favorite bunch of guys. They are friendly, love to show you their work, very appreciative when I tell them what a great job they are doing and how well I like it, and fun to be around. I think they like us, too. They always wave when I drive out of Jill and Jim’s driveway. But, they probably like us the most because we decided to add more stone to the house! 😀 More on that later.

Then, there was the drywall hanging crew. Definitely the hardest crew to get along with so far and the messiest. Granted the house was cold inside. We couldn’t do anything to heat it until they installed the sheets of drywall on the ceiling and then we could have the insulation crew come back and blow the insulation into the attic. If we turned on the portable electric furnace without the ceilings installed and insulation, the heat would have gone right up through the roof. So, the drywall crew complained and complained to Bill about lots of things. They only worked December 31st the first week.

Bill decided to put a pipe running diagonally above the fireplace mantel area if he ever wanted to run cables/wires up there. He needed to get it done before the drywallers got to that area. It was at that time that Bill noticed that we had a big dent in the pipe going up from our wood burning fireplace.

Big 'ol dent

Big ‘ol dent

Bill said the fireplace installers had to have done it. He sent pictures to the fireplace guy and to our HVAC guy to see how it could be fixed and if the dent would pose a leaking problem. Turned out Jason, the HVAC guy, provided Bill with some stainless steel and he clamped it over the pipe. And, the fireplace people gave us a $50 credit. All done before the drywallers hung the sheets around the fireplace surround.

The fixed pipe

The fixed pipe

The next week the drywallers worked on Monday (Jan. 7) and finished hanging the drywall in the house and the garage on Tuesday (Jan. 8). It was a big ‘ol mess in the house.

Big mess in the house after drywall hangers left

Big mess in the house after drywall hangers left. That’s Bill picking up some scraps.

However, we had asked that the drywall company clean up all the scraps and remove from the house. And, we agreed to a price. Best $200 we could have spent. The owner of the company ended up doing the clean-up on Wednesday, Jan. 9. He even recycled all the drywall scraps and took them away in his truck. That was a good thing. Otherwise, I think our dumpster would have had to be emptied after that! The way it is, we still have not had to pay to empty it yet.

It was exciting to see the rooms with walls up.

This slideshow requires JavaScript.

The stone guys have worked as many days as they could, weather permitting. It was interesting to see how they tented the area in the winter and used a bullet heater inside of it to set up the mortar.

Mudding the front of the house

Mudding the front of the house

Mud

Mud

The tented stone area

The tented stone area

It was so warm in the make-shift tent that they didn’t wear coats – and it was really cold outside!

Mud applied and installing the stone

Mud applied and installing the stone

Bill said it was really interesting to watch how they applied the mortar. They used bags with tips – much like ones you would use to decorate a cake!

Front section of the garage done. The ledge cap wasn't installed yet

Front section of the garage done. The ledge cap wasn’t installed yet

Front of the house with the tents

Front of the house with the tents

Friday, January 10, Bill scheduled the insulation guys to come back and blow the insulation into the attic. After that, he hooked up the portable furnace and turned it on.

Portable furnace

Portable furnace

What with those horrible Arctic temps that came through it was still hard to keep the house totally warm because we still didn’t have our garage doors! Bill had large pieces of plastic and foam insulation blocking the garage door areas. He even made a make-shift door on one side to try to keep as much heat in as possible. That Bill, he’s always trying to make things work. Wished I had a picture of that door – it was pretty ingenious! Unfortunately, that was when I was sick and I didn’t get out of the house for about 10 days except to drive down the driveway and pick up the kids from the bus stop.

Now the reason we didn’t have garage doors was because we decided to upgrade. Yep, we did! And, they had to be special ordered. Bill and I were going to keep it a secret from our builder (Jim) and Jill until they were installed. However, Jim, being the ever diligent builder – called our exterior materials rep and asked why we didn’t have doors yet. 😳 There went that surprise! Well, I think it was still a surprise, just not the one we wanted! 🙂

Tuesday, January 14, the garage doors were installed. I was holding my breath that what we picked out would match with the stone and compliment the mahogany front door. Well, they did not disappoint! We love them. We went with steel insulated fiberglass mahogany stained carriage doors with windows that mimic the grids in our front windows.

Garage doors

Garage doors

close-up of garage door

close-up of garage door

So, when the garage doors were being installed Bill and I talked that it would look strange not having the stone go all the way along the garage door side of the house. It was going to be where everyone pulled up and would see. So, we asked Rick to give us a price of what it would cost to stone the garage side. Gulp! Another upgrade. Rick said they had an extra pallet of stone so we should have enough to do it. So, we said yes!

Then . . . driving up Jill and Jim’s driveway after picking the kids up from the bus, I’m looking at the west side of the house thinking – well, this side is going to look strange not having stone on it. Who puts stone on one side of their house and not the other? Bill said he would! I said I didn’t want to. Now, don’t you think it would look better to having matching sides? Doesn’t the west side look like it needs stone?

West side of house needs stone!

West side of house needs stone!

So, Bill called Rick that evening and said verbatim, “My wife wants stone installed on the west side of the house!” 😀 So, Rick had to order more stone! We are waiting for the stone to come in to finish the exterior. But, here is what it looks like so far.

This slideshow requires JavaScript.

We had a different crew who did the taping and mudding of the drywall. Turns out they were as grumpy as the first crew! They would work one day or two a week and then not come back until the following week. They said they had to leave the mud dry so they could sand it off.

The tub in the hall bathroom has mud all over it. Yuck!

The tub in the hall bathroom has mud all over it. Yuck!

Master shower

Master shower

Family room taped and mudded

Family room taped and mudded

Kitchen

Kitchen – not sure why our well tank is inside

Dining area

Dining area

Laundry Room

Laundry Room

Since our siding guys were backed up for about a month, we didn’t get started on the siding until mid January. The siding was delivered into our garage on Thursday, January 16. This has posed a big problem for the drywallers! And, when I went down to see the siding and trim, I noticed that the shakes that we ordered for our gables were wrong.

Hardie Cement Board and trim in the garage

Hardie Cement Board and trim in the garage

Wrong shakes

Wrong shakes

The shakes we got were single 7 inch rough split with a straight edge. What we wanted are double 9 inch rough split with staggered edge. They reordered the shakes the following week. Not sure how long those will take to get in.

So, the siding guys started on Friday, January 17. They started by installing the fascia and soffits.

Soffits and Fascia

Soffits and Fascia

Since the siding guys were also going to build our columns for the front porch, Bill and I had to decide the size and where we wanted them installed on the porch. We originally had purchased stone caps for the columns the same size as Jill and Jim’s. Turns out that was way too big for our porch.

Jill and Jim's columns

Jill and Jim’s columns

So, over the weekend, Bill measured Jim and Joan’s columns on their house and we decided we needed something smaller than both of theirs! Bill got out two of our moving boxes and we placed them on the porch to get a size perspective. Turns out I didn’t want the stone to go up as far on our columns as Jill and Jim’s.

Using moving boxes to size our columns

Using moving boxes to size our columns

This is the size we decided on - 20 inch width and 18 inch depth.

This is the size we decided on – 20 inch width and 18 inch depth.

The top of the stone on the column will be the same height as the stone on the house. I wanted to make sure the columns did not block our exterior lights which will be mounted on each side of the sidelites of the door. Oh, and by the way, even though you cannot see in this picture, the color I picked for the concrete on the front porch matches the stone wonderfully! I was so happy!

Monday, January 20, we went over with the crew leader what all our exterior trim was supposed to look like before the guys started installing it that day. That evening Bill asked Jim about the flashing that was supposed to be installed behind the trim. Apparently, the guys didn’t install it. Yikes! Jim contacted the material sales guy and he contacted the siding crew. Unfortunately, Tuesday, Jan. 21, they had to rip off all the trim they had installed the day before and install the flashing.

The drywallers only worked one day last week. Bill called the owner and he said they were trying to stall their work until they could get into the garage. He said there was no way they could work around all that siding since the guys preferred to wear stilts instead of using scaffolding. And, there was no way we could manually move 7000 lbs of siding! We are anxious for the drywallers to get done as our trim and interior door package is already a week delayed in delivery. All of that needs to be stored in our house. And, I got an email that our bathroom vanities, storage cabinet and window seats are ready. At least they said they could hold them for us. What a mess working around everyone’s schedules.

So, the siding guys worked this weekend – mainly because they couldn’t work several days last week because of the weather and because we have really COLD temps coming tomorrow through Wednesday. They have gotten a lot done in those two days. I hope enough of the siding is out of the garage that the drywallers can finish this week. Here are some pictures of the siding. Now, keep in mind that the color of the lap siding is a primed colored siding. We are going to have our painter paint the siding and trim. I’ve told everyone that the siding color now reminds me of baby poop! 😯 And, I just know that when anyone rides down the road and looks at it, they will say, “What were those people thinking!” 😦

Trim around the windows

Trim around the windows

Trim around the garage doors

Trim around the garage doors

Siding on the back

Siding on the back

Back siding

Back siding

Garage side siding finished

Garage side siding finished

View of the back and garage side with siding

View of the back and garage side with siding

Starting on the front of the house with siding

Starting on the front of the house with siding

Front siding going up fast

Front siding going up fast

See, I just know you guys are saying, “What were they thinking!” as you drive past. Oh well, sometime this spring the house will be the colors I want it to be – the siding I want the same color as the fascia and soffit. And, the trim will be bronze – close to the bronze window color as possible.

Poor Bill continues to work on the cabinets when he can. He made a trip back to Indy two weeks ago and bought more mahogany plywood and got the rest of the hinges for all the cabinet doors. We are finding we lack a lot of material resources down here that Indy has. Oh well, it gave Bill a chance to go out to lunch with some of his work buddies and shop at some of the stores there. And, he got home before one of their big snows!

Bill putting together one of the upper wall cabinet doors.

Bill putting together one of the upper wall cabinet doors.

First time he ever made one with glass inserts. He's really talented.

First time he ever made one with glass inserts. He’s really talented.

And, in-between all of what has gone on in the last month, Bill and I went furniture shopping! Several times. As soon as the drywallers are done, the painter will start. And, I had not picked out any colors for the interior of the house. None! And, didn’t know where to start. I don’t think I’m going to reveal the furniture we bought until the house is done. But, I will say, Jennifer at Dean Bosler’s Furniture is the best sales woman and interior designer we could have worked with. The woman read my mind and a ton more that wasn’t in my mind. We ended up buying new furniture for the family room, a chest for the entry way, and a mattress and box spring for our “new to us” king bed. And, she picked out a paint color for the family room. Funny thing, it is the same strip that I picked out at the Benjamin Moore paint store as one of my favorites over a month before we went furniture shopping. How spooky is that?

Our painter wants to use Behr paint at Home Depot. I found out they can match any paint colors for me. So, the last several days, I’ve been creating digital mood boards using Keynote software. I place our furniture on a blank slide and color the background with paint colors. I think I’ve come up with a plan for the house. I’ve made a mood board for every room in the house. Here’s what our hall bath mood board looks like. The vanity color is showing up in the mood board with an orange tone – which it is not. It’s really called a Brandywine stain with black dye toner.

Hall Bath Mood Board

Hall Bath Mood Board

That’s about everything that’s gone on the last month.

Today is Bill’s birthday. What does Bill do on his birthday? He works on cabinets in the pole barn! Bill did tell me this morning that he cannot wait until this house is built. He isn’t enjoying all the PITA jobs that goes along with this custom build. He said it was even worse than working! I feel bad for him. He seems to make at least 5-6 trips to Menards or Lowes every week. One day he made 3 trips to Menards. We don’t live close to Menards. He said maybe it wouldn’t be so bad if he weren’t trying to build the cabinets at the same time. Every time he gets started on the cabinets, one of the contractors needs something and then that usually involves phone calls or trips to the big box store or somewhere else. We are all hoping that once the drywallers, siding guys, and stone guys get done, Bill will get a break. God bless him!

Until we meet again! Stay warm and safe. Think SPRING!

Deck the Halls with Wires and Sawdust, Fa La La La La, La La La La!

Tis the season to be jolly, fa la la la la, la la la la!

Not only is this the season to be jolly, it’s the season to be BUSY! We’ve had some ups and downs, but we are getting a lot done on the house.

When I last posted, we were supposed to have the HVAC contractors, siding guys, and the cabinet guy come the next week. Only one person (Rick from Lensing for the cabinets) showed up on Monday, November 25. He measured and looked like everything was going to work out just great . . . until he left. 😯 Key the drama button. Duh duh duh duh! I got back up to Jill’s house and Bill asked me if I told Rick that we were going to have stone all the way back to the wall on each side of the fireplace. Uh, No!!!! I forgot to tell him that! 😡 I quickly gave Rick a call. Rick had done Jill and Jim’s window seat on one side of their fireplace and kid’s computer desks on the other side. He was going on the basis of how they stopped their stone just around the edge of the fireplace since they had cabinets on each side. We estimated how thick the stone would be and made the window seats shorter than he measured. He was going to draw up plans and send to me for approval before he ordered them. Here is a snapshot of the window seats. I decided to go with drawers instead of doors as I thought we’d use the drawers to store blankets, throws, etc.

Window Seat Drawing by Rick at Lensing

Window Seat Drawing by Rick at Lensing

Tuesday, Nov. 26, the siding guys showed up. The siding had not been delivered yet. That was a blessing in disguise. Turns out the siding guys said they could not install our siding until our electricity was installed. Really? Did no one ever mention that the electricity needed to be installed prior to the siding installed? At one time we were going to have the electricians come right after plumbing but that didn’t happen. The siding guys said that since we were installing flood lights on our fascia, the electricity would have to be run before they could install siding. Jim questioned why they couldn’t start at the bottom of the house and work their way up; but, they said they preferred to wait until all electricity was run. Some things are just meant to be. I believe that is what happened in this case. The siding guys did a few preliminary installs on the corners of the house and called Benthall Brothers (our Hardie cement board distributor) to hold off delivering the siding. And, then they left.

Jim called our electrician to see what his schedule looked like and when he could pencil us in. Fred (electrician) said he was on a big job and had a couple more scheduled after that but probably could not get to us for a couple of weeks – around the second week of December. 😦 Yikes! Everyone was beating their heads thinking we really should have scheduled the electrician before now because we couldn’t move forward until that part was done. But, Bill and I found out there was still lots we could do before he arrived. It was Thanksgiving that week, and I had some Christmas shopping to do, people!

The HVAC guys came back to finish up their rough-in work on Wednesday, Nov. 28. I don’t have many photos of that. Not much to look at but some vents and tubing for the exhaust fans in the bathrooms. What I did take pictures of was the venting done for the kitchen chimney range exhaust fan. Our exhaust fan looks like this.

Our Range Chimney Exhaust Hood

Our Range Chimney Exhaust Hood

So, the HVAC guys decided to vent the exhaust fan down, through the crawl space, and out the side of the house. They said they didn’t want to go all the way up through the roof. So, this is how they roughed in the venting.

Venting the range hood

Venting the range hood

Closer view

Closer view

I kept telling Bill I just didn’t think the venting made sense to me the way it looked. He said something was off. We had a 17″ tall cabinet going above the vented area.  We didn’t think things were right. We decided to wait until after Thanksgiving and see if Bill could figure out if the venting was correct or not.

In the meantime, Bill said for me to be thinking where we might want electrical outlets and switches for our lights and fans. He wanted us to do our own walk-thru and mark where we wanted things placed before our walk-through with Fred the electrician. OMG, making all those decisions was a long and hard process. Yes, we had an electrical floor plan – but that was where light fixtures, can lights, exhaust fans, ceiling fans, and exterior lights would be installed. So, I got out my floor plan from my 3D software which had furniture placed in it to decide where I might want those outlets and cables for digital phone and TV and where I wanted CAT5 cables run for Internet. Bill & I worked on this project several days marking up the house and stapling labels on the studs.

On Tuesday morning, December 3, the fireplace installers arrived. It was great to see the fireplace inside the frame.

Fireplace installation

Fireplace installation

Fireplace inside the frame

Fireplace inside the frame

While the fireplace was being installed we had a planned walk-through meeting with Mark from Wood Specialities by Fehrenbacher. Mark has worked with us for well over a year in creating a custom baseboard, selecting wood trim for our windows and doors, selecting a design for our wooden interior doors, and headband and beam design for the family room ceiling. He gave us some ideas about transitioning from the 9 ft ceiling entry to the vaulted section of the family room. And, we were able to discuss material for a double mantle for the fireplace. He measured everything in the whole house. He said he’d send us a new quote for everything within a week or so. He did ask if we had picked out a stain color yet. I told him I was waiting for our front door to be installed so I could see the color. I wanted the stain color to match our front door and the cabinetry throughout the house. Mark said once we picked out the stain color, he would need some of it to put on the interior door sections that might expand – prior to the painter doing the staining.

Bill called our painter Mark and asked him about stain and how we went about picking out a color. He said he liked using Zar wood stain and asked that we go pick out a color at the Newburgh Benjamin Moore store. We put that on our to-do list.

Our front door had been delivered, but we were waiting on the framing crew to stop by and install it. You couldn’t see what the door looked like because it was totally boxed up. I think it was late the next evening that framer Greg and his crew came and installed our front door and the pocket door mechanism for the master closet.

Pocket Door Mechanism

Pocket Door Mechanism

Front Door Interior View (still has cardboard on it to protect it)

Front Door Interior View (still has cardboard on it to protect it)

Exterior view of the front door (has plastic on the center section)

Exterior view of the front door (has plastic on the center section)

Earlier in the week, Bill got back to looking at the venting for the range fan. He ended up getting the fan out of the box, going through the installation guide, and temporarily tacked it up to where it should be installed to see if the venting the HVAC guys would work. Here’s what he found out.

Range Fan and strange venting

Range Fan and strange venting

The venting wasn’t going to work as it. It needed to go up a lot higher. Bill text Jason the HVAC guy along with the photo above and asked if he would please come by to discuss how it could be changed. And, he said it needed to be changed before insulation was put in. More on this later.

And, while we are talking about HVAC, Jason had asked us a couple of weeks ago if we wanted to take the federal tax credit for the geothermal unit in 2013 or in 2014. The Federal credit was 30% of the cost (with no upper limit) and that included installation of it all, too. Bill and I decided since 2013 would be our craziest year for taxes (Bill retiring, both of us going on Social Security, taking out monthly retirement allocations, Medicare, selling a house, and building a new one), we thought it would be best to use the tax credit for this year. However, to do that, we had to be billed for the geothermal unit and pay for it in 2013! It was December and we had to send in our December construction draw to the bank by December 5 to get money to pay contractors by the 10th. Bill made all the phone calls and did the leg work and got an invoice for everything just in time to turn it in to the bank! Whew!

Then the weather took a dive. Thursday afternoon, December 5, we went from freezing rain to ice to snow. Friday, December 6, it snowed all day. We ended up with over 7 inches of snow. See, it was a huge blessing that the siding was not delivered. That would have been a mess!

Snow storm

Snow storm

Jill & Jim's driveway

Jill & Jim’s driveway

Needless to say we had nothing going on down at the construction site until the following week. During the snow hiatus, Bill was able to work on the cabinets a couple of days. He finished all the drawers and drilled the holes for the handles.

Cabinet drawers

Cabinet drawers

Fred the electrician called and we scheduled our walk through with him for Monday, December 9. He was impressed with all our work we did marking what and where we wanted outlets. He made his markings on the studs as we went from room to room. Oh, and I decided to make the exercise area in the laundry room my computer area instead. 🙂 I made sure we had lots of outlets and cabling for that area. Fred said they would be back on Tuesday or Wednesday to install it all.

In the meantime, Bill had made arrangements with the drywall guy Bart and Les the insulation contractor since they were next up after the electrician in the interior. Bart had to install some drywall on a couple of walls between the kitchen and garage and the laundry room and garage before Les could install foam insulation in those areas. Bart made arrangements to have some drywall sheets delivered. The drywall was delivered on Monday, Dec. 9. Bill called Bart and he said he’d be out as soon as he could.

Jim called the siding guy and told him that the electric had been roughed in. He said they were working on a job and had one or two jobs afterwards. He said it might be Christmas week or after before they would get to us. Then we talked about the possibility of getting the front porch poured before the siding was installed. Jim called the concrete guy to find out his schedule. He said that in the winter they prefer not to “blanket” colored concrete as the finish doesn’t come out as well. So, he said that if the temperatures didn’t get below 26 degrees for 4 days in a row after pouring the concrete, he could pour it for us. So, Jim told us to keep an eye on our weather app.

So, no one showed up on Tuesday, December 10.

The electrical crew arrived on Wednesday the 11th. They were by far the messiest crew we cleaned up after; however, they were the quickest! They installed it all in less than a day! Bill called me when Fred said he couldn’t really install as many can lights above our island as was on the electrical plan. He said they would be too close together. Bill wanted me to come down and “approve” the change. It was a good thing I went down there. I found a couple of things that were not installed correctly. The fewer cans above the island was fine. However, I noticed that where the guys had installed the switches for the lights by each window seat were so low that I would lean on the switch with my back. I asked that they be moved up. And, I also noticed that the vanity lights connections looked too low. I asked Bill if Fred had gone by our spec document for the installation location for the vanities. He said he didn’t know. I grabbed the document which we kept in the house and checked to see where the lights were to be installed. We have tall mirrors for the bathrooms and Bill and I had measured cabinets, granite, backsplash and mirror months ago to determine height of the lights. We talked to Fred and he brought his tape measure and sure enough the lights were about 6 inches too low. Fred had everything fixed before they left.

And, we were wired!

This slideshow requires JavaScript.

The next day the temperatures dipped all day to single digits. Bill and I went down to the house to double-check if all the electrical outlets and switches were correct and in the right location, but it was too cold to do it. So, Bill and I spent the day running errands for the new house. We went to Benthall Brothers to pick out our garage doors; stopped by Fehrenbacher’s to drop off the signed contract and pick up some sample poplar pieces for staining samples; went to the Benjamin Moore paint store with all our samples to match and picked a stain color; and then went to an electrical supply store to buy wiring for Bill to hook up a large portable furnace to use in our house. I guess it was a good day to get all that done. We figured we wouldn’t have any contractor show up on that day!

Friday the 13th Bart came and put up the drywall. And Jason’s crew came and looked at the range exhaust fan venting issue. Turns out they moved it over one stud and went up a lot further. Now, that will work!

Drywall installed along the kitchen/garage wall

Drywall installed along the kitchen/garage wall

Drywall along the laundry room/garage wall

Drywall along the laundry room/garage wall

New location of the venting for the range exhaust fan

New location of the venting for the range exhaust fan

Oh, I forgot to say that when the well guys came several weeks ago they said that there was a little white mold developing in our crawl space. YIKES! 😯 They said we probably needed to get that vapor barrier installed ASAP. Of course, the hold-up was waiting until the electric was run. Not that it was done, that barrier needed to get down. But, it was cold and nasty out. This was one PITA job Bill didn’t want to do. I didn’t want him to do it either. I told him to call a company does that and have them install it. We both checked out companies on the Internet and Bill sent an email to one to inquire what it would cost. They called. They said it would cost approximately $2K. Bill said he didn’t want to pay that much. Ugh!

Jim said he knew a recent college grad who worked construction while he was off from school. He asked if Bill wanted him to call and see if he would be interested in working for us. YES!!! Do not stop. Do not pass Go. Just call him right away! And, so he did. Todd said he’d be interested in working for us for several days. He started working last week. He cleaned up the garage and cleaned and vacuumed the house in preparation for the insulation crew on Tuesday and Wednesday for a couple of hours. They were coming Thursday, December 19.

We found out Monday that the temps were going to be soaring up into the 40s, 50s and even the 60s that week. Jim said it looked like they could pour the front porch! But, wait. We hadn’t picked out a color yet for the colored concrete. Where and how were we supposed to get that information? Jim said he’d get a brochure from Tony the concrete guy. Monday evening Jim brought home the brochure. He said if we could make a decision of what color by early Tuesday, he would call Tony and they could hopefully pour the concrete on Wednesday or Thursday. Bill looked at the brochure and picked Colonial Red. I said, “No Way!” The color decision was up to me.

I had a doctor’s appointment early Tuesday morning so I made arrangements to stop by the stone place so I could match up a concrete with our stone selection. With Rick the stone guy’s advice, I went with a lighter color than I originally wanted. He said from experience he said the darker colors show dirt and scratches more. So, I picked Sandstone for the colored concrete. I called Bill and he text Jim the color and said we wanted a smooth finish. Bill also asked if Tony could add some grit to the sealer so the concrete wouldn’t be as slippery when wet. He said he could!

Earlier in the week Bill and I went through the house to see about all the electrical stuff. We found a couple of outlets missing. And I decided to change the under-cabinet outlet wiring in the corner of the kitchen cabinets to a wall outlet. After doing some reading I found that for the appliances that people like to keep plugged in all the time (i.e., coffee pot) having the cords hanging down wasn’t a preference. So, the only appliance that Bill and I keep plugged in is the coffee pot and we had planned on keeping it in the corner. And, I discovered I had made a mistake and had the master bathroom outlets on each side of the vanity placed wrong. The hand towels would cover up the outlet. We wanted those moved. Bill called Fred and gave him a list of things and he said they’d be back out later in the week. The electrical crew came back on Wednesday and had everything done in 20 minutes! I’m telling you, these guys are fast!

Undercabinet wiring changed to outlet in kitchen corner cabinet area

Under-cabinet wiring changed to outlet in kitchen corner cabinet area

We did mess up on our labeling for the new computer area in the multi-purpose laundry room. Originally we thought we’d put two can lights above the area and had that on our label. But, when we were going room to room, I decided to move a nicer ceiling light I had originally purchased for the hall bathroom to our master closet. The master closet originally was going to have a flush mounted ceiling light just like the three in the laundry room. So, we decided we would just put that flush mounted light above the computer area. However, before the electrician’s came to install, we scratched out can lights and changed to ceiling light on the label, but forgot to scratch out the #2. So, the electricians ran two ceiling lights above the computer area. Instead of having them remove one of them, I decided to buy two smaller versions of the mounted ceiling lights – they were cheap at Menards. That way we have a spare light if anything breaks. 🙂

We had a full house at the site on Thursday, December 19. Les came with his insulation crew.

Netting with fiberglass blown in on all exterior walls and under the attic floor

Netting with fiberglass blown in on all exterior walls and under the attic floor

Spray foam up in the vaulted area of the family room

Spray foam up in the vaulted area of the family room and along the walls where the drywall was tacked up

Workers spraying 2" of the foam on all exterior walls prior to installing the netting and blowing in the fiberglass insulation

Workers spraying 2″ of the foam on all exterior walls prior to installing the netting and blowing in the fiberglass insulation

Fiberglass insulation all around that fireplace and exterior wall

Fiberglass insulation all around that fireplace and exterior wall

Sound barrier insulation between the family room and master bedroom

Sound barrier insulation between the family room and master bedroom

Sound barrier between the master bedroom and master bathroom

Sound barrier between the master bedroom and master bathroom

Sound barrier between the kitchen and laundry room walls

Sound barrier between the kitchen and laundry room walls

Tony and his crew came on Thursday, too, and poured the front porch.

Tony setting up for the concrete

Tony setting up for the concrete

Porch poured

Porch poured

Close-up of front porch

Close-up of front porch

I hope the color is going to be okay. He said we really won’t know the final color until the concrete is sealed. He said they cannot seal it for at least seven days. I’ll keep my fingers crossed that it will all match.

Bill called Todd in the afternoon since he had not shown up yet. There was a communication error. Todd thought Bill was supposed to call him when he wanted him to come out. So, Todd worked really late Thursday night in the crawl space. He also worked most of the day Friday, too. He is just about done installing the vapor barrier. Bill said he is doing a great job. He is supposed to come back today and clean all the mold with Borax and then he will be done. All the snow and ice melting last week from the high temps and 4 inches of rain over the weekend has caused a muddy mess down at the construction site.

Bill spent the weekend putting up blocking for anything we might hang – pictures, cabinets, TVs, grab bars, towel racks, etc.

IMG_3191

IMG_3194IMG_3192

With the holidays approaching we are not sure if anyone will be working this week or next. I guess we will see what Santa brings our way.